|

Data preparation on a typical design can
often represent as much as 40% of the total design cost. Pie
charts as shown here are automatically generated by our
in-house database, enabling detailed time analysis and
identification of potential cost savings.
Standard information from an engineer may
include a circuit diagram, bill of materials and a net-list.
Often, our clients are unaware of the potential time
savings that can be achieved by utilising their software to
output extra
information.
The biggest savings can be made by synchronising
our parts database with our customers such that the net-list
specifies our component footprint information. We simply
import the net-list and we are immediately on to the
placement stage.
In addition to outputting our footprint
names, some of our major clients also export placement
grouping information which has condensed the placement time.
Working with our customers in this way, we can reduce their
design costs by as much as 50%.
|